Assignment
Name: Detailed Design & Construction Supervision
of Clinker Silo, Cement Silo, Mill Building and Packing
House of Akij Cement Factory at Narayanganj |
Country: |
|
Assignment
Location within Country: Narayanganj |
Duration
of assignment (months): 34 |
|
Name of Client: Akij Group
Ltd. 73, Dilkusha C/A, |
Professional
Staff Provided by our Organization: No.
of Staff: 4 No.
of Person-Months: 40 |
|
Start
Date (Month/Year): March 2004 |
Completion Date (Month/Year): December 2006 |
|
Name
of Associated Consultants, if any: None |
No.
of Person-Months of Professional Staff Provided by Associated Consultants: Nil |
|
Name
of Senior Staff (Project Director/Coordinator, Team Leader) Involved and Functions
Performed: Sabbir
Siddique - Team Leader/Sr. Structural Engineer Aynal
Gazi - Foundation
Engineer Ashaduzzaman
- Design Engineer Md. Jubair - Jr. Engineer |
||
Detailed
Narrative Description of Project: The project consists of different buildings &
structures viz; Clinker Silos (40,000 M.T) 2 Cement Silos (10,000 M.T. each),
Packing House, Mill Building and Generator/Power House for the extension of
the Akij Cement Factory and a River
Jetty for loading/unloading of raw material. |
||
Detailed
Description of Actual Services Provided by our Staff: Design of foundation for the
Clinker and Cement Silos and other structures. Design of machine foundation
for the vertical ball mill. Design of one 30.0m dia and 60.0m high
pre-stressed concrete Clinker Silo, 2 nos. 16.0m dia. and 60.0m high Cement
Silos, their underground extraction tunnel, bucket elevator, conveyor belt,
16.0m deep caisson for the extraction tunnel elevator and preparation of BOQ
and top supervision of the construction work. Design of Cast-in-situ pile
foundation for the Jetty and RCC framed
Jetty superstructure, River bank protection work using rip-rap, Anchorage
design for the Crane and top supervision of the construction work |
||
Firm’s
Name:
Design Planning & Management Consultants Ltd.