Assignment
Name: Consultancy
Services for Management, Design & Supervision (MDS) under ADB, KFW &
GTZ assisted Second Urban Governance and Infrastructure Improvement (Sector)
Project (UGIIP-II), Loan No. 2462 BAN (SF) |
Country: |
|
Assignment
Location within Country: 35 Pourasava in 6
divisions of |
Duration
of assignment (months): 54 |
|
Name of Client: Local
Government Engineering Department (LGED) |
Professional
Staff Provided by our Organization: No.
of Staff: 07 No.
of Person-Months: 342 |
|
Start
Date (Month/Year): May 2010 |
Completion
Date (Month/Year): October
2014 |
|
Name
of Associated Consultants, if any: STUP Consultants P. Ltd., Operation Research
Group Pvt. Ltd. DDC Ltd., SODEV Consultants & SARM Associates Ltd. |
No.
of Person-Months of Professional Staff Provided by Associated Consultants: 2972 |
|
Name
of Senior Staff (Project Director/Coordinator, Team Leader) Involved and
Functions Performed: A. N. M. Sharifullah Khan --- Sr. Water Supply &
Sanitation Engineer Municipal Engineers ---
6 nos. |
||
Detailed
Narrative Description of the Project: The
project comprises of 35 selected municipalities in |
||
Detailed
Description of Actual Services Provided by our Staff: Review all previous studies and
relevant technical data on drainage, flood control, irrigation etc.
formulation of various development options, data collection, data analysis
& interpret hydrological data, delineation of command area based on
topographic survey, computation of crop water requirement and irrigation
scheduling, identify potential location of drainage system. Establishing
design criteria and frequency analysis, prepare design of various types of
hydraulic structure, drawing, estimate of costs etc. |
||
Firm’s
Name:
Design Planning & Management Consultants Ltd.