Assignment Name: Detailed Design of 342.9m long PSC Box Girder Bridge over the River KUR at 8+103.15km of the Hajigabu-Horadiz Road in Azerbaijan, financed by World Bank.

 

Country: Azerbaijan

Procuring Agency: Ministry of Transport, Govt. of Azerbaijan

 

Duration of Assignment (months): 6

Address: Ministry of Transport, Azer Road Services, Govt. of Azerbaijan

 

No. of Staff Months of our firm:  12

 

Start Date (Month/Year):

January, 2010

 

 

Completion Date  (Month/Year):

June, 2010

 

Name of Associated Consultants, if any:

 

Kocks Consult GmbH, Germany

No. of Professional Staff Months Provided by Associated Consultants:  Not Known

 

Name of Senior Professional Staff of your Firm Involved and Functions Performed (Project Director/Coordinator, Team Leader):

 

Sabbir Siddique           -           Project Manager/Sr. Bridge Engineer

 

Narrative Description of Project:

 

Construction of 342.9m long bridge with span arrangement 45m + 3x84.3m+45m. It is a pre-stressed concrete box girder bridge programmed to construct as progressive cantilever construction. Foundation type is RCC Caisson construction. 

 

Description of Actual Services Provided by our Staff within the Assignment:

 

Detailed design of the Pre-stressed Concrete Progressive Cantilever Box Girder Bridge with span arrangement of 45m+3x84.3m, preparation of specification and tender document. Detailed Supervision will be rendered during implementation.