Assignment Name: Standardization of Bridge Design in Bhutan

 

Country: Bhutan

Procuring Agency: Ministry of Works & Human Settlement, Department of Roads, Royal Government of Bhutan.   

Duration of Assignment (months): 4

Address:  Thimphu, Bhutan 

Total No. of Staff Months of the Assignment: 12

 

Start Date (Month/Year):

March, 2011

 

 

Completion Date  (Month/Year):

June, 2011

Name of Associated Consultants, if any:

 

Zorig Consultancy, Bhutan

No. of Professional Staff Months Provided by Associated Consultants:   8

 

Name of Senior Professional Staff of your Firm Involved and Functions Performed (Project Director/Coordinator, Team Leader):

 

Sabbir Siddique    :   Design Engineer

 

 

Narrative Description of Project:

The Department of Road (DoR), Ministry of Works & Human Settlement, intends to develop a new set of standard design of bridges that caters to the requirements of the existing and future traffic conditions that conforms to the newly issued guidelines for Road Classification System. So, the Bridge Division has undertaken this standardization program for standardization of bridges from span 3m to 24m for carriage way widths 3.5m, 5.5m and 7m . The objective of the consultancy service is to produce standard reinforced concrete slab and deck girder bridges of varying spans and widths.

 

Description of Actual Services Provided by our Staff within the Assignment:

The services include: Carryout detail structural analysis, design and detail drawings for RC Bridges/culverts with technical specifications, preparation of Technical Specifications and Bill of Quantities and preparation & submission of standard Design Manual.