Assignment Name: Planning,
Design & top Supervision of Khulna-Jessore Drainage Rehabilitation
Project, financed by ADB Loan No. 1285-BAN (SF) |
Country: |
|
Location within the
Country:
|
Professional Staff Provided by our firm: No. of Staff: 4 No. of Man-Months: 250 |
|
Name of the Client: WAPDA
Bhaban, Motijheel, |
||
Start Date
(Month/Year): August, 1995 |
Completion Date
(Month/Year): December, 2002 |
Approx. Value of Services:
Tk.
150.0 million |
Name of the
Associated Firms, if any: Snowy Mountains Engineering Corporation (SMEC), ACE, ECBL and ENPLAM of |
No.
of Man-Months of Professional Staff Provided by
the Associated Firms: 425 |
|
Name of Senior
Staff Involved and Functions Performed: Dr. Syed Shahrul Huq - Project
Co-ordinator Mr.
Saiful Islam Chowdhury - Sediment Specialist Mr.
Abul Bashar/ Ratish Ch. Das/
- Resident Engineer Mr.
Harun-ar-Rashid |
||
Detail Narrative
Description of the Project: The project covering an area of 100,600 ha in |
||
Detail Description
of Actual Services Provided by our company: Site survey and investigation,
preparation of topo maps, location plans, hydrological studies, sediment
survey and analyses, soil
investigation, planning, design, preparation of tender documents,
specification, BOQ, O&M Manual, Selection of Contractors, Supervision of Construction including
quality and progress monitoring, preparation of as-built drawings for
various components of the infrastructure required, such as drainage
regulators, irrigation and drainage canals, embankments for flood control and
drainage, rural roads, culverts, bridges etc. |
||
Firm’s
Name:
Design Planning & Management Consultants Ltd.