Assignment Name: Assessment of 2004 Flood Damage of Water Sector infrastructures under BWDB

 

Country: Bangladesh

Project Location within the Country: All over of Bangladesh

 

 

 

Professional Staff Provided:

 

No. of Staff: 50

No. of Man-Months: 114

 

Name of the Client: Bangladesh Water Development Board (BWDB),

 

 

Start Date (Month/Year):

 

August, 2004

Completion Date (Month/Year):

 

November, 2004

 

Approx. Value of Services

 

Tk. 9.97 million

Name of the Associated firms, if any:  None

 

 

No. of man-months of Professional

Staff Provided by the Associated

firms: None

 

Name of Senior Staff Involved and Functions Performed:

 

1.   Mesbahuddin Ahmed           -           Team Leader and In-charge of monitoring

2.   Abdul Wahab                       -           Group Leader and Site survey, compilation and reporting

3.   Md. Alam Miah                    -           Group Leader and Site survey, compilation and reporting

4.   Ghulam Mostafa                  -           Group Leader and Site survey, compilation and reporting

5.   Muhammad Ali                     -           Group Leader and Site survey, compilation and reporting

6.   M.A. Quayyum Rizvi             -           Group Leader and Site Survey, compilation and reporting

7.   Md. Nurul Alam                    -           Group Leader and Site Survey, compilation and reporting

 

Detailed Narrative Description of the Project:

 

 A catastrophic flood due to unprecedented torrential rain during Sep.12 to 17 and incessant rain during early Oct. along with cross boundary flow occurred almost all over Bangladesh. This flood caused damages to BWDB infrastructures such as embankment, irrigation/drainage canal, protective works etc. in about 600 projects/sub-projects under 7 zones and CE/CERP. BWDB appointed consultant on sole source basis for conducting survey and assessment of the damages for taking up the rehabilitation works promptly.  

 

Detail Description of Actual Services Provided by our company:

 

Made physical survey of the damaged areas, assessed the damages caused, prepared cost estimate for repair and rehabilitation of the damaged infrastructures and preparation of report.

 

 