Assignment Name: Updating/Upgrading
Feasibility Study of 3 Sub-projects under Group-A |
Country: |
|
Project Location
within the Country: North-western Regional of Bangladesh |
Professional Staff
Provided: No. of Staff: 5 No. of Man-Months: 17 |
|
Name of the Client: |
||
Start Date
(Month/Year): January, 2005 |
Completion Date
(Month/Year): September, 2005 |
Approx. Value of
Services Tk.
5.72 million |
Name of the
Associated firms, if any: KRANTI-BETS |
No.
of man-months of Professional Staff Provided by the Associated firms: 15 |
|
Name of Senior
Staff Involved and Functions Performed: 1. SMH Bokhari - Team Leader 2. Mohiruddin Ahmed - Design
Engineer 3. S. Dara Shamsuddin - Environmentalist 4. Kamal Uddin Ahmed - Agronomist |
||
Detailed Narrative
Description of the Project: The
project is to update/upgrade the feasibility study of Teesta Irrigation
Project (Phase-II), Kurigram Irrigation Project (South Unit) and Kurigram
Irrigation Project (North Unit). The purpose of the project is to provide
irrigation to increase agricultural products. As the feasibility were
conducted a decade ago, the projects are need to update/upgrade with special
attention to increase of agricultural production, environment, fisheries and
present socio-economic condition. |
||
Detail Description
of Actual Services Provided by our company: Updating would
mainly cover the engineering aspects for updating of the irrigation plan
through utilization of surface waters, mainly from the Teesta, Dharla and
Dudhkumar rivers in conjunction with the available groundwater.
Existing/proposed irrigation structures, STW/DTW, check structures, canals
and flood embankments would be reviewed in this context and
addition/reduction of structures would be assessed. Beside the irrigation
engineering, the updating would consider other important aspects such as,
agriculture, fishery, socio-economics, environment and people’s
participation. All the multi-sectoral issues would be considered in the
updating process based on global concept and the Govt. commitments towards
poverty reduction. The EIA and SIA of the project were also carried out.
Mathematical Modelling technique was applied to assess the performance of the
proposed flood protection, drainage and irrigation plan of the project in
integrated way.
|
||
Firm’s
Name:
Design Planning & Management Consultants Ltd.