Back to List

 

Assignment Name: Feasibility Study of Integrated Water Management Project of Gungiajuri Haor Area (Main Consultant)    

 

Country:  Bangladesh

Assignment Location within Country: Habiganj District  

 

Duration of assignment (months): 10

Name of Client:  Bangladesh Water Development Board. (BWDB)

 

Professional Staff Provided by our Organization:

No. of Staff: 03

No. of Person-Months:  16

Start Date (Month/Year):

 

May 2010

Completion Date (Month/Year):

 

July 2011

Name of Associated Consultants, if any:  

 

Engg. & Planning Consultants Ltd.

 

BETS Consulting Services Ltd.

 

No. of Person-Months of Professional Staff Provided by Associated Consultants: 18

 

 

Name of Senior Staff (Project Director/Coordinator, Team Leader) Involved and Functions Performed:

 

Md. Abdul Khaleque, Dy. Team Leader/ Sr. Planning Engineer

 

     Mohiruddin Ahmed, Sr. Design Engineer.

 

Detailed Narrative Description of the Project:

The Integrated Water Management Project of Gungiajuri Haor Area is located in Bahubal, Baniachang, Nabiganj and Habiganj thana of Habiganj district. It is bounded by Bijna, Gungiajuri river and Habiganj-Nabiganj road in the north, Bijna river in the east, Khowau river in the west and Dhaka-Sylhet road in the south. Its gross area is about 17,235 ha and net area is about 13,788 ha. The area is prone to flash flood and damages of standing crops every year. As a result the condition of the people of the project area is deteriorating day by day. To solve the problems of the area, feasibility study of the area will be taken to examine the viability for full flood protection with irrigation and drainage as per demand of the people as well as the requirement of the area.

 

Detailed Description of Actual Services Provided by our Staff:

 

Review all previous studies and relevant technical data on drainage, flood control, irrigation etc. formulation of various development options, data collection, data analysis & interpret hydrological data, delineation of command area based on topographic survey, computation of crop water requirement and irrigation scheduling, identify potential location of drainage system. Establishing design criteria and frequency analysis, prepare design of various types of hydraulic structure, drawing, estimate of costs etc.  

 

 

Firm’s Name: Design Planning & Management Consultants Ltd.