Assignment
Name: Feasibility Study of Integrated Water
Management Project of Gungiajuri Haor Area (Main Consultant) |
Country: |
|
Assignment
Location within Country: Habiganj District |
Duration
of assignment (months): 10 |
|
Name of Client: |
Professional
Staff Provided by our Organization: No.
of Staff: 03 No.
of Person-Months: 16 |
|
Start
Date (Month/Year): May 2010 |
Completion
Date (Month/Year): July 2011 |
|
Name
of Associated Consultants, if any: Engg.
& Planning Consultants Ltd. BETS Consulting Services Ltd. |
No.
of Person-Months of Professional Staff Provided by Associated Consultants: 18 |
|
Name
of Senior Staff (Project Director/Coordinator, Team Leader) Involved and
Functions Performed: Md. Abdul Khaleque, Dy.
Team Leader/ Sr. Planning Engineer Mohiruddin Ahmed, Sr. Design Engineer. |
||
Detailed
Narrative Description of the Project: The
Integrated Water Management Project of Gungiajuri Haor Area is located in
Bahubal, Baniachang, Nabiganj and Habiganj |
||
Detailed
Description of Actual Services Provided by our Staff: Review all previous studies and
relevant technical data on drainage, flood control, irrigation etc.
formulation of various development options, data collection, data analysis
& interpret hydrological data, delineation of command area based on
topographic survey, computation of crop water requirement and irrigation
scheduling, identify potential location of drainage system. Establishing
design criteria and frequency analysis, prepare design of various types of
hydraulic structure, drawing, estimate of costs etc. |
||
Firm’s
Name:
Design Planning & Management Consultants Ltd.