Back to List

 

Assignment Name: Feasibility Study on Alternative Location of the Intake of Saidabad Water Treatment Plant under 4th Dhaka Water Supply Project (Saidabad Water Treatment Plant Project) Phase-II

 

Country: Bangladesh

Assignment Location within Country: Saidabad, Dhaka

 

Duration of assignment (months): 6

 

Name of the Client: Dhaka Water Supply and Sewerage Authority (DWASA)

 

Professional staff provided by our Organization:

No. of Staff: 9

No. of Person Months: 18

Start Date (Month/Year):

 

June 2005

 

Completion Date: (Month/Year):

 

December, 2005

 

Approx. Value of Services:

 

Tk.  12.20 million (current US $ 0.19 million)

Name of Associated Consultants, if any:

Institute of Water Modeling (IWM)

Aqua Consultant and Associates Ltd.

No. of Person Months of Professional Staff Provided by Associated Consultants: 22

 

Name of Senior Staff (Project Director/Coordinator, Team Leader) Involved and Functions Performed:

 

1.    SMH Bokhari                       -      Team Leader

2.    Abdul Khaleque                         -    Planner/ Water Resources Engineer.

3.    Aynal Gazi                          -      Sr. Design Engineer 

4.    Sabbir Siddique                  -      Geo-Technical Engineer

5.    S. Dara Shamsuddin           -      Ecologist 

 

Narrative Description of the Project:

 

The objective of the project is to find out an alternative location on the upper stream of Sitalakhya for the intake of Saidabad Water Treatment plant. The feasibility study team including IWM studied options through Mathematical Model for various options for optimising the cost and mitigation of the adverse environmental impacts at intake & selected best possible site for alternative intake.

 

Description of Actual Services Provided by Our Staff:

 

The services of the consultant included planning, study existing situation, data collection, detailed design of various project infrastructure, DND raw water protection, Economical & Environmental Impact studies of the study area & Saidabad WTP and developing a re-settlement plan for the project affected people. Developed a plan to establish and monitor a Core-protection Zone, Impact Zone of the proposed intake.

(a)    The study also included Detailed field survey investigation and Study of Hydrological phenomena for water source selection at the proposed intake

(b)   Detailed field investigation and study of Hydro-geological phenomena for water source selection at the proposed intake including water & waste water sampling & testing.

(c)    Checking the process design of surface water treatment plant of saidabad Phase-I (225mld) & preparing recommending process design for Saidabad WTP Phase-II (225mld).

(d)   Pump & Substation selection for proposed intake.

 

Feasibility level design of intake, intake structure, pump House, Raw Water transmission main (Box culvert) & Syphons etc.   

 

Firm’s Name: Design Planning & Management Consultants Ltd.