Assignment Name:
Feasibility Study on Alternative Location of the Intake of Saidabad Water
Treatment Plant under 4th |
Country: |
|
Assignment Location
within Country: Saidabad, |
Duration of assignment (months): 6 |
|
Name of the Client: |
Professional staff
provided by our Organization: No.
of Staff: 9 No.
of Person Months: 18 |
|
Start Date (Month/Year): June
2005 |
Completion Date: (Month/Year): December,
2005 |
Approx. Value of
Services: Tk. 12.20 million (current US $ 0.19 million) |
Name of Associated
Consultants, if any: Aqua
Consultant and Associates Ltd. |
No. of Person
Months of Professional Staff Provided by Associated Consultants: 22 |
|
Name of Senior
Staff (Project Director/Coordinator, Team Leader) Involved and Functions
Performed: 1. SMH
Bokhari - Team Leader 2.
Abdul Khaleque
- Planner/ Water Resources Engineer. 3.
Aynal Gazi
- Sr. Design Engineer 4. Sabbir
Siddique - Geo-Technical Engineer 5.
S. Dara Shamsuddin - Ecologist |
||
Narrative
Description of the Project: The
objective of the project is to find out an alternative location on the upper
stream of Sitalakhya for the intake of Saidabad Water Treatment plant. The
feasibility study team including IWM studied options through Mathematical
Model for various options for optimising the cost and mitigation of the
adverse environmental impacts at intake & selected best possible site for
alternative intake. |
||
Description of
Actual Services Provided by Our Staff: The
services of the consultant included planning, study existing situation, data
collection, detailed design of various project infrastructure, DND raw water
protection, Economical & Environmental Impact studies of the study area
& Saidabad WTP and developing a re-settlement plan for the project affected
people. Developed a plan to establish and monitor a Core-protection Zone,
Impact Zone of the proposed intake. (a) The
study also included Detailed field survey investigation and Study of
Hydrological phenomena for water source selection at the proposed intake (b) Detailed
field investigation and study of Hydro-geological phenomena for water source
selection at the proposed intake including water & waste water sampling
& testing. (c) Checking
the process design of surface water treatment plant of saidabad Phase-I
(225mld) & preparing recommending process design for Saidabad WTP
Phase-II (225mld). (d) Pump
& Substation selection for proposed intake. Feasibility
level design of intake, intake structure, pump House, Raw Water transmission
main (Box culvert) & Syphons etc.
|
||
Firm’s
Name:
Design Planning & Management Consultants Ltd.