Assignment Name: Checking & Verification of the design of 485.20m long 2-lane Pre-stressed Girder Bridge (Patuakhali Bridge) over Laukhati River at 38th km on Barisal-Patuakhali Road.    

                                                            

Country: Bangladesh

Project Location within the Country: Patuakhali district

 

 

Professional staff provided by our Firm:

No. of Staff:   3

No. of Staff-Months: 4

Name of the Client: RHD (Worked as Consultant to the contractor M/S Enamul Huq)

 

Start Date (month/year):

 

April, 2001

 

Completion Date (month/year):

 

June, 2001

 

Approx. Values of Services:  

 

Tk. 0.6 million

 

Name of the Associated Consultants, if any:  None      

 

No. of Months of professional staff provided by associated consultants:  Nil

 

Name of Senior Staff Involved and Functions Performed:

 

1.   Mr. M.A. Sobhan           -           Advisor

2.   Mr. Sabbir Siddique      -           Checking of design

 

 

Detailed Narrative Description of Project:

 

It is a 848.39 meter long (as per revised design 485.20m long) 2-lane pre-stressed girder bridge over  Laukathi River on Barisal-Patuakhali Road. The objective of the project is to link two districts Barisal and Patuakhali and make road communication easier.

 

 

Detailed Description of the Actual Services Provided by our Company:

 

The services include - checking/modification of the existing design/drawings done by RHD and redesign of the different components of the bridge as necessary. (Our firm was appointed consultant by M/s Enamul Haque (Pvt.) Ltd., the Contractor of the project with approval of RHD).

 

 

 

 

Firm’s Name: Design Planning & Management Consultants Ltd.