BP26
|
Design
and Supervision Consultancy of 4-Lane Link Arch Bridge at
Tejgaon Arong - Gulshan Shooting Club Client: Dhaka
City Corporation Duration: October, 2008- December,
2011. |
BP25
|
Design
and Supervision Consultancy of Fly Over at Bahadderhat Junction
in Chittagong Client: Chittagong Development Authority
(CDA) Duration: March 2010- April 2012. |
BP24
|
Engineering
Support for Eastern Bangladesh Bridge Improvement Project
(EBBIP) CP-04-Sylhet Client: RHD Duration: April.
2012-Aug. 12. |
BP23
|
Feasibility
Study of 1.7 km long Bekutia Bridge over Kocha River on Pirojpur-Jhalokathi
Road. Client: BBA Duration: March 2011-November
2011. |
BP22
|
Design
& Monitoring of suspended form work Scafoling etc of 1072m
long Second Sitalakshya Bridge over the river Sitalakshya
at Demra, financed by KFAED Fund Client: RHD Duration:
January 2007-July 2007. |
BP21
|
Preparation
of Road Structure Manual for Strengthening of Activities in
RDEC Project, Phase-2 under JICA Assistance. Client:
LGED Duration: May 2008- February 2009. |
BP20
|
Design,
Supervision and Monitoring of Construction of 304m long &
18m wide RCC Arch Bridge over Gulshan Lake connecting Road
No. 11 of Banani and Road No. 41, 43, 34 & 35A of Gulshan
with Approach Road. Client: Local Government Engineering
Department (LGED) Duration: July, 2007- March 2009.
|
BP19
|
Detailed
Design of Bagrami-Khakijabbar-Hisarak-Sherzad-Surkhrod Road
Project in Afghanistan. Client: Ministry of Public
Works, Govt. of Afghanistan Duration: May 2008- May
2009. |
BP18
|
Construction
Supervision of 10 nos. Culverts & 4 nos. Bridges under
Bridge Replacement Project, Package No. 2 (Phase-II) Financed
by Department for International Development (DFID), U.K. Client:
Roads and Highways Department (RHD) Duration: Feb.
2005-July 2007. |
BP17
|
Preparation
of structural design of 750m long Teesta Bridge over the river
Teesta, financed by KAFAED. Client: RHD (Worked as
Consultant to the contractor Al Amin Construction Ltd.) Duration:
January, 2005- June, 2005. |
BP16
|
Design
of 10 nos. Culverts & 4 nos. Bridges under Bridge Replacement
Project, Package No. 2, (Phase-I) Financed by Department for
International Development (DFID), U.K. Client: Roads
and Highways Department (RHD) Duration: Oct. 2002-Jan.
2005. |
BP15
|
Design
& top Supervision of Large Bridges/Culverts on Important
Feeder and Rural Roads (Phase-II). Client: Local Govt.
Engineering Department (LGED) Duration: August, 2000-
Feb. 2003. |
BP14
|
Construction
Supervision of 648m long P.C. Girder Bridge (Dharala Bridge)
over The River Dharala. Client: Roads and Highways
Department (RHD) Duration: February, 2001- June, 2003.
|
BP13
|
Developing
Design Manual for Low Cost Bridges/Culverts in Flood Proofing
Project (FPP), Financed by CARE. Client: CARE, Bangladesh
Duration: April, 2001- Aug. 2001. |
BP12
|
Checking
& Verification of the design of 485.20m long 2-lane Pre-stressed
Girder Bridge (Patuakhali Bridge) over Laukhati River at 38th
km on Barisal-Patuakhali Road. Client: RHD (Worked
as Consultant to the contractor M/S Enamul Huq) Duration:
April, 2001- June, 2001. |
BP11
|
Feasibility
Study of 3rd Karnaphuli Bridge over the river Karnaphuli at
Chittagong financed by Dutch Fund. Client: RHD Duration:
Feb. 2001-June 2001. |
BP10
|
Design
& top Supervision of two 4-lane R.C.C. Arch Bridges at
Road No. 32 and Road No. 8/A, Dhanmondi R/A, Dhaka. Client:
LGED Duration: Oct. 1998- May 2000. |
BP09
|
Design
& top Supervision of 225 meters long 2-lane Reinforced
Concrete Bridge over Bangshi River at Hatubhanga, Mirzapur.
Client: LGED (Worked as Consultant to the Contractor
Monico Ltd.) Duration: July 1999- Dec. 1999. |
BP08
|
Design
& top Supervision of Large Bridges/Culverts on Important
Feeder and Rural Roads (Phase-I). Client: Local Govt.
Engineering Department (LGED) Duration: January, 1999-
December, 1999. |
BP07
|
Revision
& Upgradation of Bridge Design Manual and Software user's
Manual under BIMP-2. Client: RHD Duration: June
1999- Sept. 1999. |
BP06
|
Bridge
Improvement and Maintenance Project (BIMP-II) Training of
RHD Engineers in Bridge Design Software Client: Roads
& Highways Department Duration: June, 1999- September,
1999. |
BP05
|
Varification
& Revision of Design of 630.5m long Pre-stressed Concrete
Girder Bridge over Doratana River at 2nd km of Bagerhat-Pirojpur
Road. Client: RHD Duration: Jan. 1998- May,
1998. |
BP04
|
Detail
Design of 38m long 2-lane Bridge at Uttara Model Town, crossing
Cohor River Connecting Sectors 10 & 11 Client:
LGED Duration: July 1996- Oct. 1998. |
BP03
|
Preparation
of Design Manual for Pre-stressed Concrete Bridge. Client:
LGED Duration: July, 1995- August, 1996. |
BP02
|
Varification
& Revision of 185m long 6 span (Approx. 30m each) Pre-stressed
Concrete Girder with RCC Deck Bridge on Bored Pile Foundation
on Bhatkura-Basail Road (under Feeder Roads Improvement Project
of RHD), financed by ADB. Client: RHD Duration:
January, 1991- August, 1993. |
BP01
|
Design
& Construction Supervision of Bridges & Culverts under
Construction of 12 Structure Programme financed by US-AID.
Client: Ministry of Relief and Rehabilitation, Government
of the People's Republic of Bangladesh Duration: September,
1989- June, 1992. |