Assignment
Name: Design, Supervision and Monitoring of Construction of 304m long & 18m wide
|
Country: |
|
Assignment
Location within Country: |
Duration
of assignment (months): 21 |
|
Name of Client: Local
Government Engineering Department (LGED) |
Professional
Staff Provided by our Organization: No.
of Staff: 5 No.
of Person-Months: 46 |
|
Start
Date (Month/Year): July, 2007 |
Completion Date
(Month/Year): March 2009 |
|
Name
of Associated Consultants, if any: Vitti Sthapatibrindo Ltd. |
No.
of Person-Months of Professional Staff Provided by Associated Consultants: 19 |
|
Name
of Senior Staff (Project Director/Coordinator, Team Leader) Involved and
Functions Performed: M.A. Sobhan
- Team Leader Sabbir
Siddique -
Bridge/Structural Engineer Aynal
Gazi - Foundation
Engineer Abdus
Sattar - Resident Engineer |
||
Detailed
Narrative Description of the Project: It is a two lane two way bridge with cast-in-situ pile
foundation. The centre span is supported on two fixed end arch, while the two
ends span are simply supported box deck. The total length of the bridge is
110m and centre span length is 45m which is to be built as pre-stressed
T-deck. The overall plan is to make the bridge aesthetically beautiful to
attract the tourists and a place for recreation. Construction of |
||
Detailed
Description of Actual Services Provided by our Staff: Topographic survey, Sub-soil
investigation, traffic survey, hydrological study and environmental
assessment of the project area. Detailed design of the superstructure
including its foundation and other ancillary works like electrification,
utilities lines etc. Design of bridge approaches, cost estimate, preparation
of BOQ and tender document. Detailed supervision of construction work,
quality control of materials, checking and recommendation of contractors’
bill for payment etc. |
||
Firm’s
Name:
Design Planning & Management Consultants Ltd.