Back to List

 

Assignment Name: Design, Supervision and Monitoring of Integrated Development of Hatirjheel Area including Begunbari Khal Project

 

Country:  Bangladesh

Assignment Location within Country: Dhaka City

 

Duration of assignment (months): 30

Name of Client:  LGED

 

Professional Staff Provided by our Organization:

No. of Staff:   10

No. of Person-Months: 136  

 

Start Date (Month/Year):

 

Dec. 2008

Completion Date (Month/Year):

 

June 2012

Approx. value of Service:

Tk. 38.50 Million

 

Name of Associated Consultants, if any:  

 

Vitti Sthapatibrindo

A. I. & Associates Ltd.

 

No. of Person-Months of Professional Staff Provided by Associated Consultants: 99

 

Name of Senior Staff (Project Director/Coordinator, Team Leader) Involved and Functions Performed:

1. M.A. Sobhan                      -  Team Leader

2. Sabbir Siddique                 -   Structural Engineer

3. Aynal Gazi                         -    Foundation Engineer

4. Abdus Sattar Khan            -    Resident Engineer 

 

Detailed Narrative Description of the Project:

Objective of the project is to develop the Hatirjheel Area by developing the Jheel and constructing peripheral road, connecting bridges/overpasses, bus bay, parking space etc. in the area under LGED. Development of this infrastructure will improve the environment of the area and at the same time reduce the traffic congestion of the city. Considering the importance of environmental improvement of the area for drainage and water retention, an innovative approach will be applied to develop the concept of aesthetically beautiful structures and make innovative engineering design and then construct the project strictures using local material and available technology. The Project includes construction of 5 Nos. – 2 lane bridges having 40 m to 170 m length with Bored pile Foundation and RCC/P.C Girder superstructure.

 

Detailed Description of Actual Services Provided by our Staff:

The services of the firm include:

a. Detailed Engineering Survey & Study: Topographic survey, sub-soil investigation, traffic survey,                                                                                                                                                                                                                                                                                hydrological study.

b.  Detailed Engineering Design: Preparation of specifications, detailed design and construction drawing                               for different structures including 4 nos. Arch Bridges.

c.  Area Development:  Preparation of area plan including landscape design for beautification of the lake,      create public enjoyment space and facilities.

d.  Detailed supervision of construction works, quality control of materials and preparation of estimate.

 

 

Firm’s Name: Design Planning & Management Consultants Ltd.