Assignment Name:  Detail Design of some different size of long RCC/PC Girder Bridges at different Upazila in greater Mymensingh district

Country:  Bangladesh

Assignment Location within Country: Different Upazila of greater Mymensingh district     

 

Duration of assignment (months): 36

Name of Client:  Local Government Engineering Department (LGED)

 

Professional Staff Provided by our Organization:

No. of Staff: 06

No. of Person-Months:  171

Start Date (Month/Year):

 

July 2010

Completion Date (Month/Year):

 

June 2013

Name of Associated Consultants, if any:  None

 

 

No. of Person-Months of Professional Staff Provided by Associated Consultants: Nil

 

Name of Senior Staff (Project Director/Coordinator, Team Leader) Involved and Functions Performed:

 

Mohiruddin Ahmed --- Team Leader

 

Md. Aynal Gazi       ---  Sr. Bridge Design Engineer

 

Detailed Narrative Description of the Project:

 There are 95669m existing gaps (bridges/culverts) on different categories of existing roads of greater Mymensingh district and from that gap 5000m structures will be constructed under this project. A length of 1119.40m bridge/culvert on upazila road, 1779.88m bridges/culvert on union road & 2100.72m bridge/culvert on village road will be constructed under union connecting road and Infrastructure Development Project. The structure of the bridge/culvert will be of RCC/Pre-stressed Girder having 12m to 120m length. 

 

Detailed Description of Actual Services Provided by our Staff:

Detail survey (geometric & plan table), conduct hydrological study with necessary data collection, sub-soil investigation, topographical survey, fix up the length of the bridge and cost effective design in consideration of hydrological and morphological study report, plan, structural design & drawing including bar bending schedule, detail engineering estimate and Bill of Quantities. 

 

 

Firm’s Name: Design Planning & Management Consultants Ltd.