Assignment
Name: |
Country: |
|
Assignment
Location within Country: Different Upazila of
greater Mymensingh district |
Duration
of assignment (months): 36 |
|
Name of Client: Local
Government Engineering Department (LGED) |
Professional
Staff Provided by our Organization: No.
of Staff: 06 No.
of Person-Months: 171 |
|
Start
Date (Month/Year): July 2010 |
Completion
Date (Month/Year): June 2013 |
|
Name
of Associated Consultants, if any: None |
No.
of Person-Months of Professional Staff Provided by Associated Consultants: Nil |
|
Name
of Senior Staff (Project Director/Coordinator, Team Leader) Involved and
Functions Performed: Mohiruddin Ahmed --- Team Leader Md. Aynal Gazi
--- |
||
Detailed
Narrative Description of the Project: There are 95669m existing gaps
(bridges/culverts) on different categories of existing roads of greater
Mymensingh district and from that gap 5000m structures will be constructed
under this project. A length of 1119.40m bridge/culvert on upazila road,
1779.88m bridges/culvert on union road & 2100.72m bridge/culvert on
village road will be constructed under union connecting road and
Infrastructure Development Project. The structure of the bridge/culvert will
be of RCC/Pre-stressed Girder having 12m to 120m length. |
||
Detailed
Description of Actual Services Provided by our Staff: Detail survey (geometric & plan table), conduct
hydrological study with necessary data collection, sub-soil investigation,
topographical survey, fix up the length of the bridge and cost effective
design in consideration of hydrological and morphological study report, plan,
structural design & drawing including bar bending schedule, detail
engineering estimate and Bill of Quantities.
|
||
Firm’s
Name:
Design Planning & Management Consultants Ltd.